National
Research Council
IBS Laboratories
Mechanical design of proteomics laboratories at 100 Sussex Drive.
|
|
i-STAT
Canada Ltd., Kanata, Ontario
CAD Database and Custom Standards
Created a comprehensive CAD Database of this company’s wafer fabrication
plant, along with a customized CAD Standard.
|
|
National
Research Council
IBS Computer Room
Mechanical design of showpiece computer room at 100 Sussex Drive.
|
|
Zenastra
Photonics Inc., Ottawa, Ontario
Wafer Fab HVAC Study.
Provided an impartial, in-depth assessment of the client’s HVAC system serving
their existing Wafer Fabrication facility.
|
|
i-STAT
Canada Ltd., Kanata, Ontario
Building Systems Assessment
In depth survey and assessment of this facilities building systems and
preparation of an implementation plan.
|
|
i-STAT
Canada Ltd., Kanata, Ontario
Wafer Fab Rationalization Program
Program management, project management and complete design of a three-year space
consolidation and renewal program, of this company’s wafer fabrication plant.
|
|
Zenastra
Photonics Inc., Ottawa, Ontario
High
Purity Piping Vendor Evaluation.
Assisted in an in-depth evaluation and selection of contractors for high purity
pipework installations related to the client’s Fab Phase 2 project.
|
|
i-STAT
Canada Ltd., Kanata, Ontario
Die Bank / Die Pick Cleanroom
Complete design of low humidity, class 10,000 cleanroom.
|
|
HOK
Program Management.
Update Nortel Palladium Emergency Plan Drawings.
Updated full-colour emergency plan drawings to include an additional building at
this site.
|
|
Zenastra
Photonics Inc., Ottawa, Ontario
Fab Phase 2 Expansion.
Project management of a proposed expansion to the client’s Wafer Fabrication
facility.
|
|
i-STAT
Canada Ltd., Kanata, Ontario
Process and Materials Lab
Complete design of close temperature and humidity controlled cleanroom for
chemical preparations.
|
|
i-STAT
Canada Ltd., Kanata, Ontario
Manual Assembly Cleanroom
Complete design of close temperature and humidity controlled cleanroom.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
Photomask STEAGS Installation
Responsible for the complete design and project management of process tools
installation, in strict accordance with Nortel’s recently introduced “Facility
Services Commissioning Process “ for process tool installations.
|
|
Nortel
Networks
ST Microelectronics Cleanroom Meeting Room
Complete design and project management of a class 1000 meeting room.
|
|
Graham
Murfitt Architect, Ottawa, Ontario
75 Sparks Street Building Assessment
Assessment of mechanical systems for Public Works owned building.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
Probe and Test Cleanroom
Complete project management and design of multiphase, 20,000 square foot
cleanroom built during uninterrupted operation.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
Chilled Water Loops
Mechanical design of new chilled water loops in preparation of multiple clean
room installations.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
Burn-In Lab
Complete project management and design of new Burn-In Cleanroom.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
Emergency Plan Drawings
Preparation of full colour drawings used for Corkstown Road facility Emergency
Plan.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
On-line Operations Manual.
Developed a format for web-based operations manuals available on-line to provide
up-to-date information on complex and hazardous systems.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
Gas Monitoring Consolidation
Project management and design required to consolidate this plant’s scattered
gas monitoring systems into one location.
|
|
Nortel
Networks, Corkstown Road Facility, Nepean, Ontario
Photomask Tools installation
Project management and complete design of new process tools installation.
|
|
National
Research Council Canada
Building M-60 Mechanical Building Systems Assessment
Assessment of the mechanical systems at this building.
|
|
National
Research Council Canada
Building M-36 Process Cooling Water System
Mechanical design of extensive process cooling water system.
|
|
National
Research Council Canada
Building M-2 Second Floor Offices
Mechanical design for offices renovation.
|
|
National
Research Council Canada
Building M-54, Application for BL3 Certification
Provided technical support and consulting services to assist NRC in its
application for Biological Containment Level 3 certification.
|